Financing Secured for COVID-19 Response
(as of January 14, 2022)

The DOF has raised a total of USD22.55 billion in budgetary support financing from the ADB, World Bank, AIIB, AFD, JICA, KEXIM-EDCF and foreign currency denominated global bonds. In addition, grant and loan financing amounting to a total of USD3.25 billion have been contracted in support of various projects to be implemented by agencies involved in COVID-19 response.

Particulars
Signing/Issuance Date
Amount
in USD million
Budgetary Support Financing
2020 and 2023 Contracted Financing
WB Third Disaster Risk Management Development Policy Loan (DLP)
10-Apr-2020
(Effective: 27-Apr-2020)
500.00
ADB COVID-19 Active Response and Expenditure Support (CARES) Program
23-Apr-2020
(Effective: 27-Apr-2020)
1,500.00
ADB Social Protection Support Project - Second Additional Financing
28-Apr-2020
(Effective: 5-May-2020)
200.00
ROP USD Bonds Due 2045 (2.950% coupon)
5-May-2020
1,350.00
ROP USD Bonds Due 2030 (2.457% coupon)
5-May-2020
1,000.00
WB Emergency COVID-19 Response DPL
3-Jun-2020
(Effective: 19-Jun-2020)
500.00
ADB Support to Capital Market Generated Infrastructure Financing, Subprogram 1
4-June-2020
(Effective: 29-Jun-2020)
400.00
AIIB CARES Program
5-Jun-2020
(Effective: 30-Jun-2020)
750.00
AFD Expanding Private Participation in Infrastructure Program, Subprogram 2[a]
9 Jun-2020
(Effective: 7-Aug-2020)
171.13
AFD Inclusive Finance Development Program, Subprogram 1[b]
9-Jun-2020
(Effective: 7-Aug-2020)
114.09
ADB Expanded Social Assistance Program
15-Jun-2020
(Effective: 21-Jul-2020)
500.00
JICA COVID-19 Crisis Response Emergency Support Loan[c]
1-Jul-2020
(Effective: 11-Aug-2020)
468.39
ADB Competitive and Inclusive Agriculture Development Program, Subprogram 1
20-Aug-2020
(Effective: 16-Sep-2020)
400.00
ADB Inclusive Finance Development Program, Subprogram 2
27-Aug-2020
(Effective: 30-Sep-2020)
300.00
JICA Post Disaster Standby Loan (Phase 2)[d]
15-Sep-2020
(Effective: 15-Oct-2020)
468.39
ADB Disaster Resilience Improvement Program[e]
15-Sep-2020
(Effective: 26-Oct-2020
500.00
KEXIM-EDCF Program Loan for COVID-19 Emergency Response Program
29-Oct-2020
(Effective: 7-Dec-2020)
100.00
WB Philippines Beneficiary FIRST Social Protection Project
10-Nov-2020
(Effective: 14-Jan-2021)
580.00
ROP USD Bonds Due 2045 (2.650% coupon)
10-Dec-2020
1,500.00
ROP USD Bonds Due 2031 (1.648% coupon)
10-Dec-2020
1,250.00
WB Promoting Competitiveness and Enhancing Resilience to Natural Disasters Subprogram 2 DPL
21-Dec-2020
(Effective 16-Feb-2021)
600.00
ROP Bonds Due 2024 (0.001% coupon)[f]
13-Apr-2021
515.24
ROP Bonds Due 2025 (0.250% coupon)[g]
28-Apr-2021
741.58
ROP Bonds Due 2033 (1.200% coupon)[g]
28-Apr-2021
741.58
ROP Bonds Due 2041 (1.750% coupon)[h]
28-Apr-2021
912.71
ROP Bonds Due 2032 (1.95% coupon)
6-Jul-2021
750.0
ROP Bonds Due 2046 (3.20% coupon)
6-Jul-2021
2,250.00
WB Philippines First Financial Sector Reform Development Policy Loan
9-Aug-2021
400.00
ADB Facilitating Youth School-to-Work Transition Program, Subprogram 3
21-Sep-2021
400.00
ADB Local Governance Reform Program, Subprogram 2
19-Nov-2021
(Effective: 17-Dec-2021)
400.00
WB Philippines Fourth Disaster Risk Management Development Policy Loan with a Catastrophe Drawdown Option (CAT-DDO4)
29-Nov-2021
(Effective: 22-Dec-2021)
500.00
AFD Disaster Risk Reduction Enhancement at the Local Level Program[i]

14-Dec-2021
(Effective: 27-Dec-2021))
285.22
ADB Build Universal Health Care Program
16-Dec-2021
600.00
WB Promoting Competitiveness and Enhancing Resilience to Natural Disasters Development Policy Loan, Subprogram 3
16-Dec-2021
(Effective: 5-January-2022)
600.00
KEXIM-EDCF Program Loan for COVID-19 Emergency Response Program II-Vaccination Program (PLCERP II)
17-Dec-2021
(Effective: 27-Dec-2021)
100.0
JICA COVID-19 Crisis Response Emergency Support Loan (Phase 2)
25-Apr-2022
(Effective: 30-Jun-2022)
230.40
AFD Climate Change Action Program (CCAP), Sub-program 1
29-Dec-2022
163.35
Post Disaster Stand-by Loan Phase 3 (PDSL 3)
28-Aug-2023
(Effective: TBD)
204.00
Subtotal, 2020-2023 Contracted Financing22,946.08
Previously Contracted Financing
WB Social Welfare Development and Reform Project II - Additional Financing (AF)[j]
28-Nov-2019
(Effective: 6-Jan-2020)
200.00
Subtotal, Previously Contracted Financing200.00
Subtotal, Budgetary Support Financing23,146.08
Grant Assistance
ADB COVID-19 Emergency Response Project
16-Mar-2020
3.00
ADB Rapid Emergency Supplies Provision[k]
27-Mar-2020
5.00
Government of Japan Non-Project Grant Aid for the Provision of Medical Equipment to DOH[l]
8-Jun-2020
18.74
GOJ Programme Grant for COVID-19 Crisis Response Emergency Support (DOH)[m]
6-Jun-2021
6.44
WB-EU Second Additional Financing for Philippine Rural Development Project (PRDP-AF2)[n][o]
19-Jul-2021
(Effective: 24-Sep-2021)
20.88
Subtotal, Grant Assistance54.06
Project Loan Financing

WB Philippines COVID-19 Emergency Response Project (PCERP)
28-Apr-2020
(Effective: 6-May-2020)
100.00
WB Support to Parcelization of Lands for Individual Titling Project
14-Jul-2020
(Effective: 9-Oct-2020)
370.00
ADB Health System Enhancement to Address and Limit COVID-19 (HEAL)
8-Sep-2020
(Effective: 13-Oct-2020)
125.00
WB Philippines Beneficiary FIRST Social Protection Project
10-Nov-2020
(Effective: 14-Jan-2021)
20.00
WB AF for the KALAHI CIDSS National Community Driven Development Project (NCDDP)
21-Dec-2020
(Effective: 26-Feb-2021)
300.00
WB PCERP-AF*
19-Mar-2021
(Effective: 31-Mar-2021
500.00
ADB Second HEAL under the Asia Pacific Vaccine Access Facility (HEAL 2)*
19-Mar-2021
(Effective: 15-Apr-2021)
400.00
AIIB HEAL 2*
26-Mar-2021
(Effective: 10-May-2021)
300.00
WB PRDP-AF2[o]
19-Jul-2021
(Effective: 24-Sep-2021)
280.00
ADB HEAL 2-AF*
14-Dec-2021
250.00
AIIB HEAL 2-AF*
16-Dec-2021
250.00
WB PCERP-AF2*
29-Dec-2021
300.00
Subtotal, Loan Financing3,195.00
TOTAL26,395.14

[a]Amount in original currency: EUR150.00 million
[b]Amount in original currency: EUR100.00 million
[c]Amount in original currency: JPY50.00 billion
[d]Amount in original currency: JPY50.00 billion; disbursement is contingent on pre-agreed triggers including the declaration of a state of calamity as a result of a natural or health-related disaster, declaration of a public health emergency, and imposition of an enhanced community quarantine or its functional equivalent.
[e]For disbursement, a Disaster Event shall have occurred and in connection therewith: (i) for a natural hazard, the President has declared a state of calamity or taken equivalent measures; and (ii) for a health related emergency, the Borrower has enacted a law in response to a public health emergency, or the President has (a) declared a state of public health emergency, or (b) taken an equivalent measure including issuance of a proclamation or an executive order declaring or describing a worsening health situation, or imposing an enhanced community quarantine or its functional equivalent
[f]Amount in original currency: JPY55.00 billion
[g]]Amount in original currency: EUR650.00 million
[h]Amount in original currency: EUR800.00 million
[i]Amount in original currency: EUR250.00 million
[j]Total loan amount is USD300.00 million, of which USD200.00 million is availed for budgetary support purposes in light of COVID-19 response
[k]Executed through the issuance of a no-objection letter dated March 27, 2020
[l]Provided through Exchange of Notes dated June 8, 2020; Amount in original currency: JPY2.00 billion; Agent Agreement which will provide basis for procurement was signed on January 21, 2021
[m]Amount in original currency: JPY687 million
[n]WB-IBRD is the administrator of the European Union (EU) Philippine Rural Development Project (PRDP) Single-Donor Trust Fund
[o]The second additional financing for the retrofitting of the PRDP aims to address the threats and impacts of the COVID-19 pandemic by assisting vulnerable farmers and fisherfolk, and contribute to the overall food resiliency of the country
*For vaccine procurement
Other Financing Contracted
Particulars
Signing Date
Amount in USD million
KEXIM-EDCF Philippines-Korea Project Preparation Facility
23-Jan-2020
(Effective: 15-Jun-2020)
50.00
ROP EUR Bonds Due 2023 (0.000% coupon)[a]
3-Feb-2020
684.54
ROP EUR Bonds Due 2029 (0.700% coupon)[a]
3-Feb-2020
684.54
JICA Metro Manila Priority Bridges Seismic Improvement Project (II)[b]
30-Mar-2020
(Effective: 14-Jul-2020
41.30
JICA Davao City Bypass Construction Project (II)[c]
16-Jun-2020
(Effective: 2-Sep-2020
326.28
JICA Cebu-Mactan Bridge (4th Bridge) and Coastal Road Construction Project[d]
16-Jun-2020
(Effective: 2-Sep-2020)
1,116.88
ADB Local Governance Reform Project
1-July 2020
(Effective: 3-Aug-2020)
26.53
ADB Angat Water Transmission Improvement Project - Additional Financing[e]
13-October-2020
(Effective: 20-Nov-2020
126.02
WB Philippines Customs Modernization Project
3-December-2020
(Effective: 28-Jan-21)
88.28
ADB EDSA Greenways Project
29-December-2020
(Effective: 2-Mar-2021)
123.00
AIF EDSA Greenways Project
29-December-2020
(Effective: 2-Mar-2021)
15.0
JICA Second Tranche Loan for the Metro Manila Subway Project (Phase 1)
10-Feb-2022
(Effective: 27-May-2022)
1945.40
KEXIM-EDCF The Engineering Service for Panay-Guimaras-Negros Island Bridge Project
18-Apr-2022
(Effective: 14-Nov-2022)
56.61
TOTAL5,234.38

[a]Amount in original currency: EUR600.00 million
[b]Amount in original currency: JPY4.409 billion
[c]Amount in original currency: JPY34.83 billion
[d]Amount in original currency: JPY119.225 billion
[e]Guaranteed loan; Borrower: MWSS

Key points from the press briefing held on March 27, 2019 regarding loan agreements that the country has entered into:

  • There are no collaterals in any of the loan agreements signed by the Philippine government.
  • A waiver of immunity is standard across loan agreements the Philippines has signed, whether explicitly stated or implied via an agreement to arbitral proceedings. A waiver of immunity only allows the Philippines' counterparty in an agreement to take the country to arbitration, in the unlikely event that the Philippines defaults on its loans.
  • Arbitral rulings are still subject to the Philippine Constitution, court system and public policy.
  • The Philippine government is managing its debt responsibly.

For more information, visit the following posts debunking common misconcepcions on loan agreements:

Summary of Infrastructure Flagship Projects (IFPs) funded in part through Official Development Assistance (ODA) with signed agreements

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download [117.43 KB]

Flagship Projects
NIA

The project covers the installation of electric motor-driven pumps, the construction of pumping station and appurtenant structures, and the construction of irrigation canals, facilities, and other appurtenant structures. The project will irrigate around 8,700 hectares, benefitting about 4,350 farmers, thereby serving 21 barangays from Tuao and Piat in Cagayan, and Pinukpuk in Kalinga.

MWSS

The New Centennial Water Source-Kaliwa Dam Project (NCWS-KDP) is an integrated system that includes the 600 million liters per day (MLD) Kaliwa Dam, its intake and other appurtenant facilities, and a 2,400 MLD capacity raw water conveyance tunnel.

DPWH

Component of the Pasig-Marikina River Channel Improvement Project (Phase III), which entails the construction and improvement of the 5.4 km stretched of Lower Marikina River Channel from Napindan Channel to Manggahan Floodway and 9.9 km remaining sections between Delpan Bridge and Napindan Channel.

» General Terms and Conditions (JICA)

DPWH

Construction of a 25.3-km underground rail from Quezon City to Taguig, with an extension to the Ninoy Aquino International Airport.

» General Terms and Conditions (JICA)

DOTr

Construction of a 25.3-km underground rail from Quezon City to Taguig, with an extension to the Ninoy Aquino International Airport.

» General Terms and Conditions (JICA)

DOTr

Construction of 50.7km railway extention from Malolos-Clark International Airport and a 56.5km extension railway from Solis-Calamba.

» General Terms and Conditions (JICA)

DPWH

Construction of a bridge with will have a total length of 3.77 km, consisting of 0.32 km 2-lane main bridge (extra dosed), Pre-stressed Concrete (PSC) Beam approach bridge, with length of 2.04 km and 1.4 km 2-lanes for approach road. The project will be located across Panguil Bay between Tangub City, Misamis Occidental and Tubod, Lanao del Norte.

» General Terms and Conditions (EDCF)

DOTr

The project aims to add to the current Cebu International Port twenty-foot equivalent unit (TEU) container yard capacity of 7,373 TEUs to 14,400 TEUs. The new international port shall be built on a 25 ha. reclaimed land (Barangay Tayud, Municipality of Consolacion, Cebu), with 500 m berth length to accommodate two 2,000 TEU vessels; 4 quay cranes and superstructures (operation building, gate complex, weigh bridge, maintenance factory; and 1,450 m inland access road and 300 m offshore bridge.

» General Terms and Conditions (EDCF)

DOTr

The Manila BRT Project aims to improve the efficiency, effectiveness and safety of the public transport system along the España Boulevard-Quezon Avenue corridor in an environmentally sustainable manner.

» Signed Clean Technology Fund Loan Agreement

» Signed International Bank for Reconstruction and Development Loan Agreement

DOTr

The Project Management Consultancy will undertake the following in view of the construction phase of the PNR South Long Haul Project: (i) Preparation of the designs and terms of reference for the civil works, rolling stock, and electromechanical system; (ii)Preparation of bidding documents and tender assistance; (iii) Construction supervision; and (iv) defects liability period supervision.

DILG

The Safe Philippines Project, Phase 1 of the Department of the Interior and Local Government (DILG) aims to provide an Intelligent Video Surveillance, Analytics, and Communications system linked via a dedicated Multimedia Critical Communications infrastructure in 16 Local Government Units (LGUs) in Metro Manila. This Project shall involve the construction of a Converged Command and Control Center and integrated operations through the purchase and installation of equipment and rendering of related services. The participating LGUs are Pasig City, Marikina City, San Juan City, Mandaluyong City, Pateros, Caloocan City, Valenzuela City, Navotas City, Malabon City, Parañaque City, Las Piñas City, Quezon City, City of Manila, Taguig City, Muntinlupa City, and Pasay City.

DPWH

The Samal Island-Davao City Connector Project of the Department of Public Works and Highways aims to provide a permanent road linkage between Davao City and the Island Garden City of Samal, thereby reducing travel time and dependency on ferry services. This Project has an approximate length of 3.98km which involves the constructions of i) a toll-free 4-lane extradosed bridge with an approximate length of 2.8 kilometers and a width of 24.2 meters; and ii) interchanges with the existing road network, local existing junction improvements, viaducts over sections of land, and approach bridges over marine area.


DPWH Artist’s rendering/visualization only.

DPWH

The Priority Bridges Crossing Pasig-Marikina River and Manggahan Floodway under Chinese Government Financing (Three Priority Bridges) Project of the DPWH aims to improve road transport network capacity and efficiency in Metro Manila and alleviate traffic congestion by providing additional fixed links (bridges) and alternative routes crossing the Pasig-Marikina River and Manggahan Floodway.


DPWH Artist’s rendering/visualization only.

» Government Concessional Loan Agreement-Contract Package 1-No. GCL20220100767

» Preferential Buyer’s Credit Loan Agreement-Contract Package 1-No. PBC20220200569

» Government Concessional Loan Agreement-Contract Package 2-No. GCL20220110768

» Preferential Buyer’s Credit Loan Agreement-Contract Package 2-No. PBC20220210570

DOTr

Expected to contribute to the expansion of Metro Manila’s economic sphere, and alleviate air pollution in the area, the North -South Commuter Railway, Phase I (NSCR Phase I) (Malolos-Tutuban) aims to strengthen the transportation network and decongest Metro Manila through developing a new railway from Malolos, Bulacan to Tutuban, Manila.

The supplemental loan will cover the following scope of works under the Project:
a. Realignment of Solis-Blumentritt-Tutuban segment in Manila; and
b. Increase and change in specification and amount from the me of the previous Project appraisal in 2015

DOTr

The NSCREP aims to strengthen the connectivity of urban transportation and enhance the transportation capacity in and around Metro Manila, through the extension of the NSCR to Clark International Airport, Pampanga Province in the north and to Calamba, Laguna
Province in the south.

The 2nd tranche will finance the increase in total cost of the subject Loan from PHP628,420.89 Billion to PHP690,361.16 Billion, covering the following: (i) transfer of the scope of the electrical and mechanical (E&M) package in the Solis- Blumentritt -Tutuban segment (except Solis station) from the NSCR Project to the E&M package in NSCR extension, considering the efficiency of project implementation; and (ii) additional cost due to the transfer of a second between the South edge of the Senate staon to Bicutan station of Metro Manila Subway Project (Phase 1) (MMSP) to the Project for cost optimization purposes as requested by DOTr-Philippine National Railway. Said transfer involves both the civil and architecture, and the electrical and mechanical system (EMS) packages. Although the EMS for this segment will be part of MMSP, for contracting purposes, the cost will be financed by the NSCREP.

DOTr

The MRT 3 Rehabilitation Project includes provisions for capacity including rolling stock, rail tracks, signaling system, power supply system, overhead catenary system (OCS), communications system, and depot and staon equipment.

The supplemental loan for the Project will finance the additional scope of works under the Project, which includes the following:
a. Integration and capacity expansion;
b. Complete rehabilitation;
c. Operation and maintenance (O&M) concession dovetailing with the expiry of the Build-Lease-Transfer (BLT) agreement in 2025; and
d. Addition and extension of maintenance works to account for the six-month period of community quarantine due to the COVID-19 pandemic.

DOTr

The Project, which is on its third-tranche of implementation, aims to accommodate the increasing transport demand and alleviate the serious traffic congestion in Metro Manila and mitigate air pollution and climate variation by constructing a subway line.

Said Project involves the design and construction of a 27.5 kilometer subway line from Valenzuela to Bicutan and NAIA Terminal 3 with a 33.1 kilometer electromechanical system, which would also cover the physical integration with the North South Commuter Railway (NCSR) System (i.e. FTI to Bicutan). It also involves the construction of a depot and 17 stations (two of which will be constructed through a separate loan under the NCSR System), and the procurement of 30 train sets.

DPWH

Project aims to improve transport capacity and efficiency in the Pan-Philippine Highway Network in the Central and Northern parts of Luzon by constructing an alternative road bypassing the existing Dalton Pass, thereby contributing to the economic and social development of Central and Northern Luzon.

Specifically, the Project is a proposed 23-km alternative road, consisting of a four (4)-lane road, with two (2) lanes in each direction, bypassing the existing 77-km Dalton Pass East Bypass Route. Additionally, it involves the construction of a 6.121-km tube section, with the longer section of the northern and southern tunnels approximately measuring 4.516 km and 1.605 km in total length, respectively. It likewise involves the construction of ten (10) bridges with a total length of 5.828 km, as well as slope protection works.